Wednesday 9 March 2011

Demolition

2nd March 2011.
Okay so it's taken a while but at long last we have our builders on site. They set to work on removing the roof tiles before removing the extension. All decent roof tiles and stone are put aside for later use on the extension.

After just three days the extension has all but gone. A window is discovered, previously covered by the lean to roof space and plastered over on the inside.




After just one week, they have dug down below floor level. The soil in the garden is excellent, beneath that is compressed sand. The back garden is quite high and will need to be either sloped down or a retaining wall built.